Critical path method
What do you use to calculate the early start of an activity?
1/35

Study:

Speller

Learn

Test

Play Games:

Scatter

Space Race

Terms

Definitions

Critical path method What do you use to calculate the early start of an activity?
It is the longest path in a network diagram What is the critical path?
FALSE True or False the Critical path contains, slack, float and or total float?
FALSE True or False there can only be one critical path?
FALSE True or False, Multiple critical paths decreases project risk
Mandatory What type of dependency use hard logic, i.e. pour the foundation before buidling the walls
Soft logic or preferred i.e. paint the wall before replacing the carpet Discretionary Dependency
Based on the external needs of suppliers, Vendors, gov't agencies External Dependancy
adjusting estimates according to known risks What is the risk register used for during activity estimating?
To understand the project assumptions and constraints During schedule development what should you use the scope statement to do?
The Critical Path method What estimating method do you use to calculate the early start of an activity?
Duration What type of tool is Analoguous estimating?
Based on estimate from a similar activity in the past Analagous Estimating
Calculating the duration based on the typical length of time something takes. Parametric Estimating
The weighted average of Most Likely, Optimistic, Pessimistic (PERT) Three Point Estimates
(P+4M+O)/6 PERT
Building in Extra Time (reserve time) in response to known risks Reserve Analysis
Graphical Evaluation and Review Technique allows for probalistic determination of estimates and looping and conditional branching GERT
Adding more resources to the critical path Schedule Crashing
FALSE True or False crashing the schedule decrease the cost
Doing tasks in parallel Fast Tracking
TRUE True or False, fast tracking a project will likely increase the risk
Focuses on managing the limited resources and each activity on the critical path which results in a resources limited schedule Critical Chain Method
Critical chain method Which schedule development method results in a resource limited schedule?
Calculates the Early Start (ES) and Early Finish and LS/LF for each activity using the forward backward pass. The total float is the measure of the schedule flexibility on any path Critical Path Method
Critical path method Which schedule development method calculates the ES/EF and LS/LF for each activity?
Analysis Computer Simulation for estimating possible schedules Monte Carlo Analysis
Occurs when the the LS or LF is smaller than the ES or EF and acts as an early warning sign that the project might not finish on time Negative Slack
Original end date was unrealistic, tasks on critical path slipped, incorrect skills, resources not available on time What might cause for negative slack?
Schedule Management Plan, Schedule Baseline, Performace reports showing SPI and SV What are schedule control inputs?
Updates to the baseline, OPA, activity lists, PMP, schedule model data, Performance Measurements reported to stakholders (EV Reports) What are the outputs of schedule Control?
Actually calculating SPI and SV Performance Measurement
The ACT of reporting SPI, SV %complete etc. Progress Reporting
A part of the the ICC Process Schedule change control system
Calculating the SV Variance Analysis