paceaj

Sets (63)

Title Terms Created
Immediate Actions2January 30, 2012
09-08 Radwaste Processing10January 25, 2012
09-07 Plant Drains20January 25, 2012
09-03 Reactor Building HVAC14January 25, 2012
09-05 Area Radiation Monitoring2January 25, 2012
09-02 Standby Gas Treatment20January 24, 2012
09-01 Secondary Containment6January 24, 2012
09-04 Leak Detection15January 23, 2012
08-05 Nuclear Steam Supply Shutoff System32January 20, 2012
08-06 Process Radiation Monitoring13January 19, 2012
08-04 Containment Instrument Air17January 19, 2012
08-03 Nitrogen Inerting9January 19, 2012
08-01 Primary Containment38January 18, 2012
07-04 Residual Heat Removal26January 13, 2012
07-03 Low Pressure Core Spray15January 11, 2012
07-02 High Pressure Core Spray19January 11, 2012
07-07 Standby Service Water23January 6, 2012
07-06 Reactor Core Isolated Cooling31January 6, 2012
06-08 Reactor Protection System20December 29, 2011
06-04 Average Power Range Monitor15December 29, 2011
06-03 Local Power Range Monitoring7December 29, 2011
06-02 Intermediate Range Monitor13December 29, 2011
06-01 Source Range Monitor13December 28, 2011
05-01 Control Rod Drive Mechanism2December 2, 2011
05-04 Reactor Recirculation (in progress)22December 1, 2011
05-03 Standby Liquid Control13November 30, 2011
04-02 Nuclear Boiler Instrumentation24November 29, 2011
04-06 Fuel Handling (in progress)28November 22, 2011
04-03 Feedwater Level Control (in progress)2November 18, 2011
04-01 Reactor Pressure Vessel66November 16, 2011
03-01 Reactor Closed Cooling25November 11, 2011
03-08 Potable Water19November 11, 2011
03-06 Seismic Monitoring19November 10, 2011
03-04 MET Tower11November 10, 2011
03-09 Demineralized Water System13November 10, 2011
02-05 FW Heater Vents & Drains8November 9, 2011
03-07 Radwaste building HVAC13November 9, 2011
03-05 Turbine Building HVAC12November 9, 2011
03-02 Fire Protection19November 9, 2011
03-13 Plant Computer14November 8, 2011
02-09 Circ Water and Tower Makeup16November 4, 2011
02-06 Air Removal13November 4, 2011
02-07 Seal Steam12November 4, 2011
02-01 Main Steam22November 3, 2011
02-10 Plant Service Water (TSW)8November 3, 2011
02-03 Feedwater24November 1, 2011
02-02 Condensate17October 27, 2011
02-04 Condensate Storage & Transfer24October 26, 2011
02-12 Supervisory16October 26, 2011
Tech Specs 3.1: Reactivity Control Systems16October 26, 2011
Technical Specifications Intro25October 26, 2011
01-08 Stator Cooling Water10October 25, 2011
01-10 Seal Oil10October 25, 2011
01-12 Main Turbine Lube Oil & Purification12October 25, 2011
01-09 Main Generator H2 / CO29October 25, 2011
01-06 Main Turbine10October 25, 2011
01-05 Main Generator12October 25, 2011
01-04 Isophasic Busductomatic9October 25, 2011
01-07 DEH12October 25, 2011
01-11 Bleed Steam12October 25, 2011
01-03 UPS14October 25, 2011
01-01 DC Distribution23October 24, 2011
01-02 AC Distribution12October 24, 2011

Subjects

Subject User's Sets
ILC 20
63

Combinations

Sets Page First set
12Combo01-08 Stator Cooling Water

Studied

Study Mode Set Last Studied
Cards05-03 Standby Liquid ControlOctober 4, 2012
Cards09-08 Radwaste ProcessingOctober 4, 2012
Learn01-01 DC DistributionOctober 4, 2012
Cards01-01 DC DistributionOctober 4, 2012
Learn09-07 Plant DrainsJuly 18, 2012
Scatter01-01 DC DistributionJuly 18, 2012
LearnCombo with 01-08 Stator Cooling Water and 11 othersOctober 26, 2011
Scatter01-03 UPSOctober 25, 2011
Test01-03 UPSOctober 25, 2011

Discussions

Chat log is private

Classes

No classes

Statistics

Sets created63
Terms entered1,028
Study sessions9
Total answers (Test & Learn)14
Discussion messages0
Days of membership578