| Immediate Actions | 2 | January 30, 2012 |
| 09-08 Radwaste Processing | 10 | January 25, 2012 |
| 09-07 Plant Drains | 20 | January 25, 2012 |
| 09-03 Reactor Building HVAC | 14 | January 25, 2012 |
| 09-05 Area Radiation Monitoring | 2 | January 25, 2012 |
| 09-02 Standby Gas Treatment | 20 | January 24, 2012 |
| 09-01 Secondary Containment | 6 | January 24, 2012 |
| 09-04 Leak Detection | 15 | January 23, 2012 |
| 08-05 Nuclear Steam Supply Shutoff System | 32 | January 20, 2012 |
| 08-06 Process Radiation Monitoring | 13 | January 19, 2012 |
| 08-04 Containment Instrument Air | 17 | January 19, 2012 |
| 08-03 Nitrogen Inerting | 9 | January 19, 2012 |
| 08-01 Primary Containment | 38 | January 18, 2012 |
| 07-04 Residual Heat Removal | 26 | January 13, 2012 |
| 07-03 Low Pressure Core Spray | 15 | January 11, 2012 |
| 07-02 High Pressure Core Spray | 19 | January 11, 2012 |
| 07-07 Standby Service Water | 23 | January 6, 2012 |
| 07-06 Reactor Core Isolated Cooling | 31 | January 6, 2012 |
| 06-08 Reactor Protection System | 20 | December 29, 2011 |
| 06-04 Average Power Range Monitor | 15 | December 29, 2011 |
| 06-03 Local Power Range Monitoring | 7 | December 29, 2011 |
| 06-02 Intermediate Range Monitor | 13 | December 29, 2011 |
| 06-01 Source Range Monitor | 13 | December 28, 2011 |
| 05-01 Control Rod Drive Mechanism | 2 | December 2, 2011 |
05-04 Reactor Recirculation (in progress) | 22 | December 1, 2011 |
05-03 Standby Liquid Control | 13 | November 30, 2011 |
| 04-02 Nuclear Boiler Instrumentation | 24 | November 29, 2011 |
| 04-06 Fuel Handling (in progress) | 28 | November 22, 2011 |
| 04-03 Feedwater Level Control (in progress) | 2 | November 18, 2011 |
04-01 Reactor Pressure Vessel | 66 | November 16, 2011 |
| 03-01 Reactor Closed Cooling | 25 | November 11, 2011 |
| 03-08 Potable Water | 19 | November 11, 2011 |
| 03-06 Seismic Monitoring | 19 | November 10, 2011 |
| 03-04 MET Tower | 11 | November 10, 2011 |
03-09 Demineralized Water System | 13 | November 10, 2011 |
| 02-05 FW Heater Vents & Drains | 8 | November 9, 2011 |
| 03-07 Radwaste building HVAC | 13 | November 9, 2011 |
| 03-05 Turbine Building HVAC | 12 | November 9, 2011 |
| 03-02 Fire Protection | 19 | November 9, 2011 |
| 03-13 Plant Computer | 14 | November 8, 2011 |
| 02-09 Circ Water and Tower Makeup | 16 | November 4, 2011 |
| 02-06 Air Removal | 13 | November 4, 2011 |
| 02-07 Seal Steam | 12 | November 4, 2011 |
02-01 Main Steam | 22 | November 3, 2011 |
| 02-10 Plant Service Water (TSW) | 8 | November 3, 2011 |
| 02-03 Feedwater | 24 | November 1, 2011 |
| 02-02 Condensate | 17 | October 27, 2011 |
| 02-04 Condensate Storage & Transfer | 24 | October 26, 2011 |
| 02-12 Supervisory | 16 | October 26, 2011 |
| Tech Specs 3.1: Reactivity Control Systems | 16 | October 26, 2011 |
| Technical Specifications Intro | 25 | October 26, 2011 |
| 01-08 Stator Cooling Water | 10 | October 25, 2011 |
| 01-10 Seal Oil | 10 | October 25, 2011 |
| 01-12 Main Turbine Lube Oil & Purification | 12 | October 25, 2011 |
| 01-09 Main Generator H2 / CO2 | 9 | October 25, 2011 |
| 01-06 Main Turbine | 10 | October 25, 2011 |
| 01-05 Main Generator | 12 | October 25, 2011 |
| 01-04 Isophasic Busductomatic | 9 | October 25, 2011 |
| 01-07 DEH | 12 | October 25, 2011 |
| 01-11 Bleed Steam | 12 | October 25, 2011 |
| 01-03 UPS | 14 | October 25, 2011 |
| 01-01 DC Distribution | 23 | October 24, 2011 |
| 01-02 AC Distribution | 12 | October 24, 2011 |