33. What does TPS stand for?
a. Total Production Streamlining
b. Toyota Production System
c. Taguchi's Production S's
d. Total Process Simplification
e. None of the above
b (Just-in-time, the Toyota production system, and lean operations; easy)
34. Which of the following is generally found in most JIT environments?
a. a push or pull system, depending upon the rate of demand
b. a push system for high margin items and a pull system for low margin items
c. a push system for purchased parts and a pull system for manufactured parts
d. push systems
e. pull systems
e (Just-in-time, the Toyota production system, and lean operations; moderate)
35. Which one of the following is not a benefit of the implementation of JIT?
a. cost reduction
b. variability increase
c. rapid throughput
d. quality improvement
e. rework reduction
b (Just-in-time (JIT), easy)
36. Which of the following is not a reason for variability?
a. Employees, machines, and suppliers produce units late.
b. Customer demand is unknown.
c. Employees, machines, and suppliers produce units that conform to standards.
d. Engineering drawings are inaccurate.
e. Drawings or specifications are incomplete.
c (Just-in-time, the Toyota production system, and lean operations; easy)
37. Which of the following is specifically characterized by a focus on continuous improvement, respect
for people, and standard work practices?
a. Just-in-time (JIT)
b. Toyota Production System (TPS)
c. Lean operations
d. Material requirements planning (MRP)
e. kanban
b (Just-in-time, the Toyota production system, and lean operations; moderate)
38. Which of the following is specifically characterized by continuous and forced problem solving via
a focus on throughput and reduced inventory?
a. Just-in-time (JIT)
b. Toyota Production System (TPS)
c. Lean operations
d. Material requirements planning (MRP)
e. kanban
a (Just-in-time, the Toyota production system, and lean operations; moderate)
39. Which of the following statements regarding a pull system is true?
a. Large lots are pulled from upstream stations.
b. Work is pulled to the downstream stations before it is actually needed.
c. Manufacturing cycle time is increased.
d. Problems become more obvious.
e. None of the above is true of a pull system.
d (Just-in-time, the Toyota production system, and lean operations; moderate)
40. Manufacturing cycle time is best defined as the
a. length of the work shift, expressed in minutes per day
b. time it takes a unit to move from one workstation to the next
c. time between the start of one unit and the start of the next unit
d. sum of all the task times to make one unit of a product
e. time from raw materials receipt to finished product exit
e (Just-in-time, the Toyota production system, and lean operations; moderate)
41. If the goals of JIT partnerships are met, which of the following is a result?
a. For incoming goods, receiving activity and inspection are outsourced.
b. In-transit inventory falls as suppliers are located closer to facilities.
c. The number of suppliers increases.
d. In-plant inventory replaces in-transit inventory.
e. All of the above are consequences of meeting the JIT partnership goals.
b (Just-in-time (JIT), moderate)
42. Which one of the following is a characteristic of a JIT partnership?
a. large number of suppliers
b. maximal product specifications imposed on supplier
c. active pursuit of vertical integration
d. removal of incoming inspection
e. frequent deliveries in large lot quantities
d (Just-in-time (JIT), moderate)
43. Which of the following is specifically characterized by the elimination of waste through a focus on
exactly what the customer wants?
a. Just-in-time (JIT)
b. Toyota Production System (TPS)
c. Lean operations
d. Material requirements planning (MRP)
e. kanban
c (Just-in-time, the Toyota production system, and lean operations; moderate)
44. Characteristics of JIT partnerships with respect to suppliers include
a. competitive bidding encouraged
b. buyer plant pursues vertical integration to reduce the number of suppliers
c. support suppliers so they become or remain price competitive
d. most suppliers at considerable distance from purchasing organization
e. All of the above are characteristics of JIT partnerships.
c (Just-in-time (JIT), moderate)
45. Characteristics of just-in-time partnerships do not include
a. removal of in-transit inventory
b. large lot sizes to save on setup costs and to gain quantity discounts
c. long-term contracts
d. few suppliers
e. buyer helps supplier to meet the quality requirements
b (Just-in-time (JIT), moderate)
46. What is the time required to move orders through the production process, from receipt to delivery?
a. throughput
b. manufacturing cycle time
c. pull time
d. push time
e. queuing time
a (Just-in-time, the Toyota production system, and lean operations; moderate)
47. Which of the following is not a goal of JIT partnerships?
a. removal of unnecessary activities
b. removal of in-plant inventory
c. removal of in-transit inventory
d. removal of engineering changes
e. All of the above are goals of JIT partnerships.
d (Just-in-time (JIT), moderate)
Sets with similar terms
ISDS Chapter 16
51 terms
ISDS 3115 CH 16
51 terms
ISDS FINAL CHAPTER 16
82 terms
ISDS FINAL CHAPTER 16
82 terms
Sets found in the same folder
Supply Chain Exam 2 (Chapter 16)
79 terms
ISDS 3115 Chapter 11
85 terms
Chapter 12 Management
82 terms
CHAPTER 16: JUST-IN-TIME AND LEAN PRODUCTION SYSTE…
25 terms
Other sets by this creator
Chapter 14
60 terms
Chapter 12
49 terms
Chapter 11
52 terms
Chp 15
55 terms
Verified questions
ENGINEERING
Solar energy stored in large bodies of water, called solar ponds, is being used to generate electricity. If such a solar power plant has an efficiency of 3 percent and a net power output of 150 kW, determine the average value of the required solar energy collection rate, in Btu/h.
ENGINEERING
What does the friction coefficient represent in flow over a flat plate? How is it related to the drag force acting on the plate?
ENGINEERING
To control an isentropic steam turbine, a throttle valve is placed in the steam line leading to the turbine inlet. Steam at 6 MPa and $600^{\circ} \mathrm{C}$ is supplied to the throttle inlet, and the turbine exhaust pressure is set at 40 kPa. What is the effect on the stream exergy at the turbine inlet when the throttle valve is partially closed such that the pressure at the turbine inlet is 2 MPa? Compare the second-law efficiency of this system when the valve is partially open to when it is fully open. Take $T_{0}=25^{\circ} \mathrm{C}.$
ENGINEERING
Given $$ f(x, y) = 2.25xy + 1.75y - 1.5x^2 - 2y^2 $$ Construct and solve a system of linear algebraic equations that maximizes $$ f(x) $$ . Note that this is done by setting the partial derivatives of $$ f $$ with respect to both x and y to zero
Other Quizlet sets
Choosing a legal form
23 terms
Interpersonal Processes Chapter 9 & 10
39 terms
Bio 9H Chapter 15
55 terms
Oceanography final
26 terms
Related questions
QUESTION
Which CRC duty position recognizes and controls the effects of Electronic Attack (EA) while maintaining the radar's presentation and emissions?
QUESTION
When a vessel is inclined by an external force, the...
QUESTION
What is the correct temperature for quenching AISI C1095 tool steel? For any carbon Steel?
QUESTION
The boarding timeline suggests the captain should receive "boarding complete" statement from FA "A" between D-09 and D-04. If fueling is complete, and no other outstanding requirements remain, the captain will then tell the FA "A"?